{"title":"일정과 선후 관계를 한눈에 보려면 무엇을 확인해야 하나요? — 칸 자료","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","citation":"WorkTool(주식회사 뉴웨이브코퍼레이션), 일정과 선후 관계를 한눈에 보려면 무엇을 확인해야 하나요?, https://worktool.wiki/situations/project-schedule-gantt, 확인 2026-11-06 KST, CC BY 4.0","page":{"path":"/situations/project-schedule-gantt","url":"https://worktool.wiki/situations/project-schedule-gantt","title":"일정과 선후 관계를 한눈에 보려면 무엇을 확인해야 하나요?"},"checked":{"from":"2026-10-22","to":"2026-11-06"},"methodology":"/methodology","columns":["service_slug","service_name","topic_id","situation_id","situation_name","condition_id","condition_name","status","status_label","source_url","checked_on","fact_id","plan","region","unit","observed_value","valid_period","evidence_locator","evidence_version","u_reason","u_group","u_question","u_detail"],"rowCount":117,"rows":[{"service_slug":"airtable","service_name":"Airtable","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"airtable:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Airtable 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"airtable","service_name":"Airtable","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"airtable:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Airtable 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"airtable","service_name":"Airtable","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"airtable:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Airtable 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"asana","service_name":"Asana","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://asana.com/pricing","checked_on":"2026-11-05","fact_id":"asana:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"Calendar view (Personal and up)","valid_period":null,"evidence_locator":"목록, 보드, 캘린더 보기 필요한 방식으로 업무를 확인하세요. 맥락을 잃지 않고 목록에서 세부 정보, 보드에서 흐름, 캘린더에서 마감일을 확인하세요.","evidence_version":"row:d350c3036c9f8128cdd7071d1b00e580b79f33bd840989283cefd0d4786e9c7d","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"asana","service_name":"Asana","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://asana.com/pricing","checked_on":"2026-11-05","fact_id":"asana:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Task dependencies supported","valid_period":null,"evidence_locator":"대화형 간트 차트로 작업 종속성 및 진행 상태를 자세히 살펴보세요.","evidence_version":"row:91577ed4cfc88ea847442506c36eec5f4a3ced838ccfbb3f94dadb3f6b9fb6ac","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"asana","service_name":"Asana","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://asana.com/pricing","checked_on":"2026-11-05","fact_id":"asana:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Timeline and Gantt views (Starter and up)","valid_period":null,"evidence_locator":"타임라인 및 간트뷰 자신 있게 프로젝트를 계획하세요. 타임라인에서 일정을 시각화하고, 대화형 간트 차트로 작업 종속성 및 진행 상태를 자세히 살펴보세요.","evidence_version":"row:97ac18017325520dd161f1673a2ae9bd043ebdec31bb559372b18a6ed06c0d42","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"basecamp","service_name":"Basecamp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://basecamp.com/features","checked_on":"2026-10-22","fact_id":"basecamp:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"Built-in project calendar","valid_period":null,"evidence_locator":"Add a built-in calendar to your project for deadlines, milestones, events, and meetings.","evidence_version":"row:661e33535c0ef4d8527383a32b2f4f868bd3c8861549f2c4171f0f68b79089d4","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"basecamp","service_name":"Basecamp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"basecamp:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Basecamp 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"basecamp","service_name":"Basecamp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"basecamp:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Basecamp 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"celoxis","service_name":"Celoxis","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"celoxis:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Celoxis 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"celoxis","service_name":"Celoxis","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.celoxis.com/","checked_on":"2026-10-22","fact_id":"celoxis:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Dependencies set on interactive Gantt","valid_period":null,"evidence_locator":"Build the WBS, set dependencies and critical path on an interactive Gantt","evidence_version":"row:759773e5e388483f16cffabec3220aeb27fc0f200dd74535e46ff53bc43a6636","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"celoxis","service_name":"Celoxis","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.celoxis.com/pricing","checked_on":"2026-10-22","fact_id":"celoxis:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Gantt charts and advanced scheduling","valid_period":null,"evidence_locator":"Gantt charts and advanced scheduling","evidence_version":"row:6e46a47b5fcae2fa1630dafac0ee29a20b6dc94237ba67c546bc20b7f78e695a","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"clickup","service_name":"ClickUp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://clickup.com/pricing","checked_on":"2026-11-06","fact_id":"clickup:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"Calendar View (Free)","valid_period":null,"evidence_locator":"Calendar View","evidence_version":"row:f3016cb22ba5f03c69473cc32535cf1183b3f0326d00ba85d4a4256afaedd40c","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"clickup","service_name":"ClickUp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://clickup.com/features","checked_on":"2026-11-06","fact_id":"clickup:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Dependencies managed on project timeline","valid_period":null,"evidence_locator":"Plan projects on a timeline with task bars, dependencies and drag-to-reschedule dates across a whole location.","evidence_version":"row:3e29dfe1e887a956985bc09d848b431ba9a96773df8bae4dbab7dcc7af31a3cb","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"clickup","service_name":"ClickUp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://clickup.com/pricing","checked_on":"2026-11-06","fact_id":"clickup:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Unlimited Gantt Charts (Unlimited plan)","valid_period":null,"evidence_locator":"Unlimited Gantt Charts","evidence_version":"row:11c5bed894492e2033883705c14ae879ba39ccfd28ea7d37a26818e6f049b5b9","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"dooray","service_name":"Dooray!","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://dooray.com/main/en/service/calendar/","checked_on":"2026-11-05","fact_id":"dooray:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"You can check the work schedules registered in the project with the project calendar.","valid_period":null,"evidence_locator":"You can check the work schedules registered in the project with the project calendar.","evidence_version":"row:1593ebd5ac102456b65fdb63b3849bdc6d12d56dae7bdf4a85d2f39a1072e1b2","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"dooray","service_name":"Dooray!","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"공식 문서에 없음","source_url":"https://helpdesk.dooray.com/share/pages/9wWo-xwiR66BO5LGshgVTg/3459330666602654073","checked_on":"2026-11-05","fact_id":"dooray:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Dooray! 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-11-05 03:37 KST"},{"service_slug":"dooray","service_name":"Dooray!","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"공식 문서에 없음","source_url":"https://helpdesk.dooray.com/share/pages/9wWo-xwiR66BO5LGshgVTg/2940119188829554457","checked_on":"2026-11-05","fact_id":"dooray:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Dooray! 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-11-05 03:37 KST"},{"service_slug":"flow","service_name":"플로우","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://support.flow.team/ko/flow/4403871878541","checked_on":"2026-11-05","fact_id":"flow:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"등록된 일정은 '캘린더' 탭에서 한눈에 확인할 수 있습니다.","valid_period":null,"evidence_locator":"등록된 일정은 '캘린더' 탭에서 한눈에 확인할 수 있습니다.","evidence_version":"row:e6ed841951079e8d2a51d819233c9e764c59e334084ebfedeb201f15122c87ed","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"flow","service_name":"플로우","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-11-05","fact_id":"flow:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"scope_unclear","u_group":"pending","u_question":"플로우 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 범위 불명"},{"service_slug":"flow","service_name":"플로우","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://flow.team/kr/enterprise/project","checked_on":"2026-11-05","fact_id":"flow:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"간트차트로 한눈에 보고 계획대로 실행하세요.","valid_period":null,"evidence_locator":"간트차트로 한눈에 보고 계획대로 실행하세요.","evidence_version":"row:877918d394d0295eb2320783e4910853cf0ee39e46861cbbefd32e081ca16d0a","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"freedcamp","service_name":"Freedcamp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"freedcamp:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Freedcamp 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"freedcamp","service_name":"Freedcamp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"freedcamp:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Freedcamp 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"freedcamp","service_name":"Freedcamp","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://freedcamp.com/pricing","checked_on":"2026-11-05","fact_id":"freedcamp:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Gantt Chart View","valid_period":null,"evidence_locator":"Gantt Chart View","evidence_version":"row:cc9fb9663ddd31fad6a562334156fb14393208406a953ee9ec60edcc6562e75b","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"hive","service_name":"Hive","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://hive.com/pricing","checked_on":"2026-10-31","fact_id":"hive:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"In-app calendar","valid_period":null,"evidence_locator":"In-app calendar","evidence_version":"row:c47a3889204d8b42bf12563667c7aa1cb1cc8fc5b8823a33b772bdd84cbb64b2","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"hive","service_name":"Hive","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"hive:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Hive 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"hive","service_name":"Hive","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://hive.com/pricing","checked_on":"2026-10-31","fact_id":"hive:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Gantt view","valid_period":null,"evidence_locator":"Gantt view","evidence_version":"row:f79c4d2a367f17d861d3e96de87a042bdf751b83522223a4a08b84b624d1e413","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"insa","service_name":"인사책","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://insacheck.com/guides/playbook/인사책-기능-범위-파일클라우드-프로젝트-메신저-업무책-현재-상태","checked_on":"2026-10-26","fact_id":"insa:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"업무 캘린더 월 보기","valid_period":null,"evidence_locator":"업무 캘린더는 월 보기만 있고, 업무를 프로젝트 단위로 묶거나 칸반으로 옮기는 기능은 없습니다.","evidence_version":"row:116a5344d505775785e9b0d01f338c3527d6ebfc1a2a4e811cfb1c842dd77502","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"insa","service_name":"인사책","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"insa:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"인사책 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"insa","service_name":"인사책","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"N","status_label":"조건 불충족","source_url":"https://insacheck.com/guides/playbook/협업도구-대체-범위-문서저장-공동편집-프로젝트-화상회의","checked_on":"2026-10-26","fact_id":"insa:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"간트 일정표 없음","valid_period":null,"evidence_locator":"업무를 카드로 옮기는 칸반 보드·간트 일정표, 화상회의는 없으므로","evidence_version":"row:60d6efe28ea419d71796817246308435357ab1521f94b57c4114a514c510fb7e","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"jandi","service_name":"잔디","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"jandi:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"잔디 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(본문 읽기 실패) · 시도 2026-10-22 13:03 KST"},{"service_slug":"jandi","service_name":"잔디","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"jandi:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"잔디 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(본문 읽기 실패) · 시도 2026-10-22 13:03 KST"},{"service_slug":"jandi","service_name":"잔디","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"jandi:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"잔디 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(본문 읽기 실패) · 시도 2026-10-22 13:03 KST"},{"service_slug":"jira","service_name":"Jira","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.atlassian.com/software/jira/features","checked_on":"2026-10-22","fact_id":"jira:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"Calendar view","valid_period":null,"evidence_locator":"Stay up-to-date on the work's progress using the view you like: boards, lists, timeline, or calendars.","evidence_version":"row:21ff0faa3215cc13a212b8e5dfb127e11ebcb3f2fe9dbb7685aa645beb0d2f2d","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"jira","service_name":"Jira","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.atlassian.com/software/jira/features","checked_on":"2026-10-22","fact_id":"jira:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Manage dependencies","valid_period":null,"evidence_locator":"Manage dependencies","evidence_version":"row:684e97fc647eee28117212bc5d9e9aa8ce8fd59bf9343dab79b5013cf863d27a","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"jira","service_name":"Jira","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.atlassian.com/software/jira/features","checked_on":"2026-10-22","fact_id":"jira:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Timeline view (not named Gantt)","valid_period":null,"evidence_locator":"Stay up-to-date on the work's progress using the view you like: boards, lists, timeline, or calendars.","evidence_version":"row:c538b6f7248eec23d63ad97daa318390cd719ea7316618c2a211975ab8ae55df","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"kakao-work","service_name":"카카오워크","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.kakaowork.com/pricing","checked_on":"2026-10-22","fact_id":"kakao-work:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"카카오워크 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"kakao-work","service_name":"카카오워크","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.kakaowork.com/pricing","checked_on":"2026-10-22","fact_id":"kakao-work:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"카카오워크 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"kakao-work","service_name":"카카오워크","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.kakaowork.com/pricing","checked_on":"2026-10-22","fact_id":"kakao-work:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"카카오워크 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"kollabi","service_name":"콜라비","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://collabee.co.kr/","checked_on":"2026-10-22","fact_id":"kollabi:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"팀 일정·마감 캘린더","valid_period":null,"evidence_locator":"팀의 일정과 마감을 캘린더에서 공유하고","evidence_version":"row:82432c7b5d6dfbc998d389f16764d7ef45cfc81c0da110e57ea6286fc3c63139","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"kollabi","service_name":"콜라비","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"공식 문서에 없음","source_url":"https://collabee.co.kr/","checked_on":"2026-10-22","fact_id":"kollabi:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"콜라비 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"kollabi","service_name":"콜라비","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"공식 문서에 없음","source_url":"https://collabee.co.kr/","checked_on":"2026-10-22","fact_id":"kollabi:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"콜라비 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"lark","service_name":"Lark","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"lark:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"Lark 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(JS 렌더링) · 시도 2026-10-22 13:01 KST"},{"service_slug":"lark","service_name":"Lark","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"lark:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"Lark 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(JS 렌더링) · 시도 2026-10-22 13:01 KST"},{"service_slug":"lark","service_name":"Lark","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"lark:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"Lark 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(JS 렌더링) · 시도 2026-10-22 13:01 KST"},{"service_slug":"linear","service_name":"Linear","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"linear:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Linear 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"linear","service_name":"Linear","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"linear:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Linear 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"linear","service_name":"Linear","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"linear:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Linear 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"microsoft-planner","service_name":"Microsoft Planner","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"microsoft-planner:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"Microsoft Planner 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(HTTP 403) · 시도 2026-10-22 13:01 KST"},{"service_slug":"microsoft-planner","service_name":"Microsoft Planner","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"microsoft-planner:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"Microsoft Planner 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(HTTP 403) · 시도 2026-10-22 13:01 KST"},{"service_slug":"microsoft-planner","service_name":"Microsoft Planner","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"사이트 차단","source_url":"","checked_on":"2026-10-22","fact_id":"microsoft-planner:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"blocked","u_group":"site_blocked","u_question":"Microsoft Planner 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"사이트 차단 — 공식 사이트가 자동 확인을 막음(HTTP 403) · 시도 2026-10-22 13:01 KST"},{"service_slug":"monday-com","service_name":"monday.com","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://monday.com/pricing","checked_on":"2026-10-22","fact_id":"monday-com:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"캘린더 보기","valid_period":null,"evidence_locator":"Calendar view","evidence_version":"row:35a48cd36bd40002b5cab5b48e68f92eda71f1420d1e98fcf95c0667d44c4014","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"monday-com","service_name":"monday.com","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://monday.com/features/gantt","checked_on":"2026-10-22","fact_id":"monday-com:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"작업 간 의존 관계","valid_period":null,"evidence_locator":"Task dependencies","evidence_version":"row:eec6a4e38601ed49c7965354809aac4e3b12abefaed5bdda5fcb697ab9e6fa58","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"monday-com","service_name":"monday.com","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://monday.com/pricing","checked_on":"2026-10-22","fact_id":"monday-com:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"타임라인·간트 보기","valid_period":null,"evidence_locator":"Timeline & Gantt views","evidence_version":"row:e7a5f1c6ae1100fbc8aecf5fddf4006bf1d296eab8b765c1c900692ba7ac9f30","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"naver-works","service_name":"네이버웍스","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://naver.worksmobile.com/products/naver-works/calendar/","checked_on":"2026-11-05","fact_id":"naver-works:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"구성원 일정 보기를 통해 다른 구성원의 캘린더 일정 또한 확인할 수 있어","valid_period":null,"evidence_locator":"구성원 일정 보기를 통해 다른 구성원의 캘린더 일정 또한 확인할 수 있어","evidence_version":"row:254e9c81eb523dd8a99ee3760932873ad838266b1612c13c38a753b7f63c545a","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"naver-works","service_name":"네이버웍스","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"공식 문서에 없음","source_url":"https://help.worksmobile.com/en/admin-guides/security/network-security/","checked_on":"2026-11-05","fact_id":"naver-works:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"네이버웍스 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-11-05 03:37 KST"},{"service_slug":"naver-works","service_name":"네이버웍스","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"공식 문서에 없음","source_url":"https://help.worksmobile.com/en/admin-guides/archive/policy/","checked_on":"2026-11-05","fact_id":"naver-works:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"네이버웍스 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-11-05 03:37 KST"},{"service_slug":"nifty","service_name":"Nifty","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"nifty:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Nifty 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"nifty","service_name":"Nifty","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://niftypm.com/pricing","checked_on":"2026-10-22","fact_id":"nifty:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Task Dependencies","valid_period":null,"evidence_locator":"Task Dependencies","evidence_version":"row:ae15401e602252eee15412251df9aff213b32fde399c15266012369bfb5a4eec","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"nifty","service_name":"Nifty","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://niftypm.com/pricing","checked_on":"2026-10-22","fact_id":"nifty:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Gantt plan milestones on a visual timeline","valid_period":null,"evidence_locator":"Gantt Plan milestones on a visual timeline","evidence_version":"row:a07c2f898a0b55a6ffe17d9aa1f4c73733057f9adbf9e529e66a2c80c661ae37","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"notion","service_name":"Notion","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.notion.com/product/projects","checked_on":"2026-11-05","fact_id":"notion:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"Calendar formats","valid_period":null,"evidence_locator":"Visualize the work in distinct formats, from calendars to boards.","evidence_version":"row:649d52cb3541a693e9e54b1fd17271ed9159ec60f0baf01a42fe3ec81d481399","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"notion","service_name":"Notion","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.notion.com/pricing","checked_on":"2026-11-05","fact_id":"notion:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Subtasks and dependencies in databases","valid_period":null,"evidence_locator":"Add subtasks, and link dependencies.","evidence_version":"row:f4514a0dbaf85184282e1965c48cf237792e50e04115849026bd792ed078344e","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"notion","service_name":"Notion","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.notion.com/product/projects","checked_on":"2026-11-05","fact_id":"notion:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Projects as timeline view","valid_period":null,"evidence_locator":"View projects as a timeline for a bird's eye view","evidence_version":"row:237bd11f11bc57aa6aeb58394ed8c619788f2fc91f7947217480f16c8a2f8ff6","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"ntask","service_name":"nTask","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.ntaskmanager.com/pricing/","checked_on":"2026-10-22","fact_id":"ntask:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"리스트·그리드·캘린더 보기","valid_period":null,"evidence_locator":"List, Grid & Calendar View","evidence_version":"row:961a035bfe0d32d6e542c556ae5623d671c5daf5da847db57b8f6ce966dc6f76","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"ntask","service_name":"nTask","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.ntaskmanager.com/pricing/","checked_on":"2026-10-22","fact_id":"ntask:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"작업 의존 관계","valid_period":null,"evidence_locator":"Task Dependencies","evidence_version":"row:069dfe1a5b2baed8e7358373b07331486dd2c2cc2340992d4fe5b410f097e274","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"ntask","service_name":"nTask","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"ntask:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"sources_differ","u_group":"pending","u_question":"nTask 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 출처끼리 다름"},{"service_slug":"paymo","service_name":"Paymo","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.paymoapp.com/pricing/","checked_on":"2026-10-22","fact_id":"paymo:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"Task Calendar View","valid_period":null,"evidence_locator":"Task Calendar View","evidence_version":"row:ff969fa09e036258ac0a88f1b0cb2b458f67c45974b2f20fd046d426632cf7ce","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"paymo","service_name":"Paymo","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.paymoapp.com/pricing/","checked_on":"2026-10-22","fact_id":"paymo:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Task Dependencies","valid_period":null,"evidence_locator":"Task Dependencies","evidence_version":"row:efd92661df7a71ecf80eed3fcbf59001d4c4c91fd8357120e4bf109b41431ea7","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"paymo","service_name":"Paymo","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.paymoapp.com/pricing/","checked_on":"2026-10-22","fact_id":"paymo:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Task Gantt Chart View","valid_period":null,"evidence_locator":"Task Gantt Chart View","evidence_version":"row:90dc65e4c0959296300b781e68fb7f40dc91e98155c4f4a3d71334aa2377b0a5","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"plane","service_name":"Plane","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://plane.so/pricing","checked_on":"2026-10-22","fact_id":"plane:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"Calendar layout","valid_period":null,"evidence_locator":"Choose from the List, the Board, the Calendar, the Gantt, or the Spreadsheet layout for your work items.","evidence_version":"row:6263d8d0e763118cd9079bdfcd3dcd80f1cc4762b0335dafa586720293f315c4","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"plane","service_name":"Plane","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://plane.so/pricing","checked_on":"2026-10-22","fact_id":"plane:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Dependencies shown on Timeline layout","valid_period":null,"evidence_locator":"Dependencies in Timeline Adjust timelines for dependent work items visually on the Timeline layout.","evidence_version":"row:f40419d3a5924c818075446bbe9dd20a47df5a7edaf0c91b79f7465b6ae34c11","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"plane","service_name":"Plane","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://plane.so/pricing","checked_on":"2026-10-22","fact_id":"plane:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Gantt layout","valid_period":null,"evidence_locator":"Choose from the List, the Board, the Calendar, the Gantt, or the Spreadsheet layout for your work items.","evidence_version":"row:c047a8a949a4c3aa3fad92ac276ffe2ae3db458849a24007934f559f1da1185e","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"planio","service_name":"Planio","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"planio:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Planio 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"planio","service_name":"Planio","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"planio:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Planio 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"planio","service_name":"Planio","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"planio:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Planio 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"productive","service_name":"Productive","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"productive:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Productive 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"productive","service_name":"Productive","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"productive:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"pending","u_group":"pending","u_question":"Productive 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 아직 공식 문서 확인 전"},{"service_slug":"productive","service_name":"Productive","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://productive.io/pricing/","checked_on":"2026-10-22","fact_id":"productive:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Gantt Charts (project management)","valid_period":null,"evidence_locator":"Project Management Gantt Charts Docs Workload","evidence_version":"row:cb4eb1de356616b4c6e31150363f4b285c2cd371e7a9f60b54b021c442a4132e","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"proofhub","service_name":"ProofHub","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.proofhub.com/pricing","checked_on":"2026-10-22","fact_id":"proofhub:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"Calendar task view","valid_period":null,"evidence_locator":"Task management (Board view, Gantt, Table view, Calendar)","evidence_version":"row:884ab4066ef7b1676ca6d493506f34f699f9eb2b85b9679d70181e7cd647ff39","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"proofhub","service_name":"ProofHub","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.proofhub.com/pricing","checked_on":"2026-10-22","fact_id":"proofhub:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"Dependencies set on tasks","valid_period":null,"evidence_locator":"Set dependencies, pinpoint roadblocks, and stay ahead of deadlines.","evidence_version":"row:108ad8d59f32f09100b2e1e751745b4873f04536bacf529365f2993790ae67e1","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"proofhub","service_name":"ProofHub","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.proofhub.com/pricing","checked_on":"2026-10-22","fact_id":"proofhub:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Gantt chart","valid_period":null,"evidence_locator":"Gantt chart","evidence_version":"row:73b42c158466764a4b1477d0c77971a89d209b487d973ad2436cbe8bb2ebd5c9","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"shortcut","service_name":"Shortcut","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.shortcut.com/pricing","checked_on":"2026-10-22","fact_id":"shortcut:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Shortcut 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"shortcut","service_name":"Shortcut","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.shortcut.com/pricing","checked_on":"2026-10-22","fact_id":"shortcut:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Shortcut 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"shortcut","service_name":"Shortcut","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.shortcut.com/pricing","checked_on":"2026-10-22","fact_id":"shortcut:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Shortcut 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"smartsheet","service_name":"Smartsheet","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.smartsheet.com/pricing","checked_on":"2026-10-22","fact_id":"smartsheet:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"캘린더 보기 포함","valid_period":null,"evidence_locator":"Calendar view","evidence_version":"row:3da3896f40a88c88c4a3ea942d59f150533b67c057e9c817b4b5231699efad4e","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"smartsheet","service_name":"Smartsheet","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.smartsheet.com/pricing","checked_on":"2026-10-22","fact_id":"smartsheet:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"선후 관계 행 전 요금제 표시","valid_period":null,"evidence_locator":"Dependencies","evidence_version":"row:152e2b0dfc2bbdbf02469f91af35e90a395004c37fca22d0f066b287576902b3","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"smartsheet","service_name":"Smartsheet","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.smartsheet.com/pricing","checked_on":"2026-10-22","fact_id":"smartsheet:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Pro 이상 간트 보기 포함","valid_period":null,"evidence_locator":"Gantt, table, board, and calendar view","evidence_version":"row:1ea815aa0ff019b59c60447be06d117d3f86379520ba9c3dcf23a9871d5101a0","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"swit","service_name":"스윗","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"공식 문서에 없음","source_url":"https://swit.io/automation","checked_on":"2026-10-22","fact_id":"swit:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"스윗 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"swit","service_name":"스윗","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"공식 문서에 없음","source_url":"https://swit.io/all-features","checked_on":"2026-10-22","fact_id":"swit:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"스윗 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"swit","service_name":"스윗","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"공식 문서에 없음","source_url":"https://swit.io/all-features","checked_on":"2026-10-22","fact_id":"swit:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"스윗 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"taskworld","service_name":"Taskworld","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"taskworld:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"sources_differ","u_group":"pending","u_question":"Taskworld 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 출처끼리 다름"},{"service_slug":"taskworld","service_name":"Taskworld","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"taskworld:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"sources_differ","u_group":"pending","u_question":"Taskworld 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"확인 대기 — 출처끼리 다름"},{"service_slug":"taskworld","service_name":"Taskworld","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"확인 대기","source_url":"","checked_on":"2026-10-22","fact_id":"taskworld:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"sources_differ","u_group":"pending","u_question":"Taskworld 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"확인 대기 — 출처끼리 다름"},{"service_slug":"teamgantt","service_name":"TeamGantt","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.teamgantt.com/pricing","checked_on":"2026-10-22","fact_id":"teamgantt:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"캘린더 보기 포함","valid_period":null,"evidence_locator":"Calendar view","evidence_version":"row:d55e7548c77b89db922db6091f29a5b70f0be4c8cf6a476fe75a7c63a4c93659","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"teamgantt","service_name":"TeamGantt","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.teamgantt.com/platform/project-scheduling","checked_on":"2026-10-22","fact_id":"teamgantt:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"작업 간 의존 관계","valid_period":null,"evidence_locator":"Task dependencies","evidence_version":"row:5eeca76a642e748e2d6b219a9127049838db3aaae3c47383b4a58c45a6307feb","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"teamgantt","service_name":"TeamGantt","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.teamgantt.com/platform/project-scheduling","checked_on":"2026-10-22","fact_id":"teamgantt:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"간트·리스트·보드·캘린더 보기 전환","valid_period":null,"evidence_locator":"switch between Gantt, list, board, and calendar views","evidence_version":"row:7ab5ef42cafbbb5bab573f0a314df96985fadf78f4745e51754327f5734c64e8","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"teamwork-com","service_name":"Teamwork.com","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.teamwork.com/product/my-calendar/","checked_on":"2026-10-22","fact_id":"teamwork-com:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Teamwork.com 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"teamwork-com","service_name":"Teamwork.com","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.teamwork.com/pricing/","checked_on":"2026-10-22","fact_id":"teamwork-com:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"하위 작업·태그·선후 관계","valid_period":null,"evidence_locator":"Structure work with sub-tasks, tags, dependencies","evidence_version":"row:f57e2e452cc6462f6a3d00afaf598402d4986dae2870c0f7b7e65546bb67806e","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"teamwork-com","service_name":"Teamwork.com","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.teamwork.com/pricing/","checked_on":"2026-10-22","fact_id":"teamwork-com:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"Gantt 보기 포함","valid_period":null,"evidence_locator":"Work with Gantt, Table, List & Board views","evidence_version":"row:8354548c0f5db2298b47ba2ad24ce4c699a0e035ea8ded8c7520880c9cd4b0f7","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"todoist","service_name":"Todoist","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.todoist.com/pricing","checked_on":"2026-11-04","fact_id":"todoist:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"캘린더 레이아웃","valid_period":null,"evidence_locator":"Calendar layout","evidence_version":"row:2e202a47782262c59a63474086ca93f059c83afb87fa73020cbb89d8157865d1","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"todoist","service_name":"Todoist","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.todoist.com/pricing","checked_on":"2026-11-04","fact_id":"todoist:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Todoist 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-11-04 22:48 KST"},{"service_slug":"todoist","service_name":"Todoist","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.todoist.com/pricing","checked_on":"2026-11-04","fact_id":"todoist:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Todoist 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-11-04 22:48 KST"},{"service_slug":"trello","service_name":"Trello","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://trello.com/pricing","checked_on":"2026-10-22","fact_id":"trello:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"캘린더 보기","valid_period":null,"evidence_locator":"Calendar view","evidence_version":"row:171ecc811cbeb5e557919b7a86f44daa7b754806f6a2513026947d5a3dc15fc1","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"trello","service_name":"Trello","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"U","status_label":"공식 문서에 없음","source_url":"https://trello.com/pricing","checked_on":"2026-10-22","fact_id":"trello:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Trello 공식 문서에서: 작업 간 선후행 의존 관계 설정이 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"trello","service_name":"Trello","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://trello.com/pricing","checked_on":"2026-10-22","fact_id":"trello:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"타임라인 보기 (Premium)","valid_period":null,"evidence_locator":"Timeline view","evidence_version":"row:e2bd9ddaad4684b506a44d3f84b90e4925dfabd8b439b03c390cd26554537983","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"wrike","service_name":"Wrike","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.wrike.com/price/","checked_on":"2026-10-22","fact_id":"wrike:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Wrike 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"wrike","service_name":"Wrike","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.wrike.com/features/gantt-chart/","checked_on":"2026-10-22","fact_id":"wrike:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"의존 관계 관리","valid_period":null,"evidence_locator":"manage dependencies, adjust timelines, track progress","evidence_version":"row:67a0ff4a6d736a95f5263beee98520071b8dc7e4c80a4a8218c37a8eddb04e6b","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"wrike","service_name":"Wrike","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.wrike.com/price/","checked_on":"2026-10-22","fact_id":"wrike:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"인터랙티브 간트 차트","valid_period":null,"evidence_locator":"Interactive Gantt charts","evidence_version":"row:d5af941049c7ba2a59628033133119bd2f00199c2701e96610613130faaa074f","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"youtrack","service_name":"YouTrack","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.jetbrains.com/youtrack/features/","checked_on":"2026-10-22","fact_id":"youtrack:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"YouTrack 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"youtrack","service_name":"YouTrack","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.jetbrains.com/youtrack/features/","checked_on":"2026-10-22","fact_id":"youtrack:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"선후 관계 설정","valid_period":null,"evidence_locator":"set estimates and dependencies","evidence_version":"row:ff3ed0116a49f64183bbb995e715e8d04494a62688c437d68db4234138256c48","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"youtrack","service_name":"YouTrack","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.jetbrains.com/youtrack/features/","checked_on":"2026-10-22","fact_id":"youtrack:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"인터랙티브 간트 타임라인","valid_period":null,"evidence_locator":"Plan projects using the interactive Gantt timeline","evidence_version":"row:7e2de5cf6d7e8ff34472732c0044d9ff0a107ec2c008f5df5e63443b2ca96a7b","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"zoho-projects","service_name":"Zoho Projects","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.zoho.com/projects/zohoprojects-pricing.html","checked_on":"2026-10-22","fact_id":"zoho-projects:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Zoho Projects 공식 문서에서: 업무 캘린더 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"},{"service_slug":"zoho-projects","service_name":"Zoho Projects","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.zoho.com/projects/zohoprojects-pricing.html","checked_on":"2026-10-22","fact_id":"zoho-projects:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"작업 선후 관계","valid_period":null,"evidence_locator":"Task Dependency","evidence_version":"row:dbfe00c43780a1747821a6c110c7e9533bae377525d3b20dbfee66833880d239","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"zoho-projects","service_name":"Zoho Projects","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"C","status_label":"공식 확인","source_url":"https://www.zoho.com/projects/gantt-charts.html","checked_on":"2026-10-22","fact_id":"zoho-projects:project.gantt","plan":null,"region":null,"unit":null,"observed_value":"간트 차트","valid_period":null,"evidence_locator":"Gantt chart","evidence_version":"row:e5b41b726055955c4b58b53569d50c01e3e1b7b4fe654ce86f4a45f4b6e2815b","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"zoho-sprints","service_name":"Zoho Sprints","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.calendar_view","condition_name":"캘린더 보기","status":"C","status_label":"공식 확인","source_url":"https://www.zoho.com/sprints/pricing.html","checked_on":"2026-10-22","fact_id":"zoho-sprints:project.calendar_view","plan":null,"region":null,"unit":null,"observed_value":"캘린더 보기","valid_period":null,"evidence_locator":"Calendar View","evidence_version":"row:5df31db199717641311c05d931516d352f3cb387b8710f729494d7285cb5f92a","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"zoho-sprints","service_name":"Zoho Sprints","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.dependencies","condition_name":"작업 선후 관계","status":"C","status_label":"공식 확인","source_url":"https://www.zoho.com/sprints/features.html","checked_on":"2026-10-22","fact_id":"zoho-sprints:project.dependencies","plan":null,"region":null,"unit":null,"observed_value":"작업 간 연결·의존","valid_period":null,"evidence_locator":"Create relationships between work items to make dependencies and blockers visible","evidence_version":"row:4f73881e09fd98d570038f6dadb04858262347c1c61e8d8e69294f2ab19f2232","u_reason":null,"u_group":null,"u_question":null,"u_detail":null},{"service_slug":"zoho-sprints","service_name":"Zoho Sprints","topic_id":"project","situation_id":"project-schedule-gantt","situation_name":"일정·간트 관리","condition_id":"project.gantt","condition_name":"간트 차트","status":"U","status_label":"공식 문서에 없음","source_url":"https://www.zoho.com/sprints/pricing.html","checked_on":"2026-10-22","fact_id":"zoho-sprints:project.gantt","plan":null,"region":null,"unit":null,"observed_value":null,"valid_period":null,"evidence_locator":null,"evidence_version":null,"u_reason":"not_stated","u_group":"not_in_docs","u_question":"Zoho Sprints 공식 문서에서: 간트 차트 또는 타임라인 보기가 공식 문서에 있는가?","u_detail":"공식 문서에 없음 — 읽은 공식 쪽 1개 · 2026-10-22 13:03 KST"}]}